What can rule out a trenchless proposal?
Ask the plan to address the actual route and host pipe. EPA’s 2010 comparison identifies sags and upsizing as limits of standard lining, and many bends as a problem for bursting. NASSCO describes obstructions or damaged sections that can require a point repair before lining. Access pits, connections and any preparatory excavation belong in the written scope.
EPA technical comparison, July 2010; NASSCO CIPP guideline, 2023
